Plasterboard set straight, joints that disappear.

Plasterboard renovation in Le Puy-en-Velay. Partition walls, suspended ceilings, insulated linings, taping and filling, for homeowners, landlords and businesses.

Your project involves:

  • Free, itemised quote
  • Site visit before pricing
  • Protected site, cleaned after
1 / 5Laser set-out for partitions

From framing to finish

Four trades, often combined on one job and always itemised line by line in the quote.

Partitions going up under exposed beams, framing and boards visible

Partition walls

Add a bedroom, close off a walk-in wardrobe, rework a whole floor. Metal-stud partitions in standard, moisture-resistant or acoustic board, depending on the room.

  • Laser set-out, tracks and studs
  • Sound insulation inside the wall if needed
  • Backing for tall units and bathroom fittings
  • Taping and filling through to the finish
Get a quote for partitions

Also: boxing in stairs and beams, pipe boxing, bathrooms in moisture-resistant board, repairs to damaged plasterboard.

Projects

A new-build house followed from bare trusses to a finished room, photographed at every stage.

  1. Stage 1: metal battens fixed under the roof trussesStage 1 of 4

    Battens under the trusses

    The future ceiling’s rails are set level with a laser across the whole floor.

  2. Stage 2: ceiling boarded and walls lined with insulationStage 2 of 4

    Ceiling boarded, walls lined

    Boards screwed to the ceiling, insulation fitted behind the framing on outside walls.

  3. Stage 3: metal studs for the partitions in placeStage 3 of 4

    Partitions framed

    Metal studs lay out the rooms: bedrooms, bathroom, storage.

  4. Stage 4: finished living room with smooth walls and ceilingStage 4 of 4

    Room handed over

    Taping, filling, sanding, painting: the room is ready to live in.

More projects

Stone house

New ceiling under the joists, joints finished, stone wall kept exposed.

Commercial premises

Perforated acoustic ceiling and paint-ready walls.

Stairwell

Smooth walls and crisp corners, ready for paint.

Finished hallway
Living room and kitchen handed over
Painted finish with crisp lines
Bathroom in moisture-resistant board

How a job runs

Five steps, the same for one wall or a whole house.

  1. Step 1: Visit and measure

    We come and see the rooms, take measurements and note what you want to achieve.

  2. Step 2: Itemised quote

    A line-by-line quote with the materials and a start date. Free, with no obligation.

  3. Step 3: Preparation

    Floors and joinery protected, access and cutting area agreed with you.

  4. Step 4: Installation

    Set-out, framing, insulation, boards, with a progress update at each key stage.

  5. Step 5: Finishing and handover

    Taping, filling, sanding, cleaning, then a walk round the rooms with you.

Your free quote in three steps

A few questions about your project, then your request goes out on WhatsApp, already written. We reply within a day to arrange a visit.

  • Free, with no obligation
  • Itemised, line by line
  • Your details are only used to reply to you

Step 1 of 3

What work do you need?

Choose one or more
Property (optional)
You are (optional)

WhatsApp opens with your request already written: just press Send.

Call Free quote